What is the average cost of AIO measures? Compare the monthly fees and total amount of 3 public companies
According to the published prices of the three companies confirmed on November 10, 2026, continued support for AIO measures starts from 65,000 yen, 150,000 yen, and 500,000 yen per month. In some cases, a single diagnosis costs 49,800 yen, and initial construction costs 198,000 yen. Please check not only the monthly fee, but also the initial cost, target pages, scope of production/implementation, and contract period. Even if the publication fee is the same, the total amount cannot be compared if the scope of work is different.
These are public plan examples from each company, and are not average prices for the entire market or ZETTAi prices. The total calculation in the second half is also a fictitious example. The basics of the service are What are AIO measures? Differences between SEO and LLMO and 5 steps to start at your own company.
How much does the monthly fee for AIO countermeasures start from?
The published prices confirmed on the official pages of each company on November 10, 2026 are as follows. This table is not a price list in monthly order. It shows how the cost structure differs between one-time diagnosis, continuous operation, and comprehensive support.
| Provider and plan | Publication fee | Main contents and contract conditions |
|---|---|---|
| AIO Countermeasures Partners https://aiosearch.net/aio-cost | Diagnosis 49,800 yen, initial construction starting from 198,000 yen, continuous light 65,000 yen per month (all excluding tax) | Continuous light includes monthly diagnosis, 1 article, 4 FAQs, monthly reports, etc. Continuation plans are for those who have received a diagnosis or initial construction |
| Cloud CIRCUS's AIO countermeasure light https://gmg.cloudcircus.jp/aio.html | 150,000 yen per month | Posts design, investigation, analysis, LLMO countermeasures, MEO countermeasures, and content production. Confirm tax classification, initial cost, minimum contract period, and number of productions at the time of estimate |
| High Virtue Lab's comprehensive support https://hvl.jp/service/geo/ | Accompanying type starts from 500,000 yen per month (excluding tax) | Design, implementation, and improvement of measurement, content, technology, external references, and official information. The contract period is from 12 months. Specialized type has a different support range starting from 300,000 yen per month (excluding tax) |
For example, if you decide on a budget based only on the 65,000 yen per month for continuous light, you will overlook the cost of the necessary diagnosis or initial construction. On the other hand, comprehensive support of 500,000 yen per month has a different scope of work and contract conditions of 12 months or more than continuous light. None of these numbers represent the market average.
Before signing an actual contract, please check with each company the tax classification, initial cost, target URL, number of production/editing times, publishing work, and minimum contract period. Even if the published price is low, the total cost will be higher if the required work is not covered.
What are the costs of AIO measures divided into?
| Cost items | Deliverables to check | Conditions that are likely to result in additional costs |
|---|---|---|
| Initial diagnosis and design | Target search terms, URLs, problems, and improvement order | Add target sites, languages, and departments |
| Article/page improvement | Manuscripts, interviews, comparison tables, evidence materials | Number of articles produced, expert confirmation, image creation |
| Technical implementation | HTML, internal links, transfers, structured data | CMS renovation, development environment, publishing work |
| Continuous observation and improvement | Observation log, report, next revision proposal | Number of questions, target AI, measurement frequency |
| Internal operations/external tools | Approval, information provision, tool contracts | Personnel hours, pay-as-you-go, additional seats |
If it says "AIO compatible set", please confirm in writing how much of this table is included. We will compare contracts that receive reports and contracts that include modifications to the actual page separately.
What are the conditions that cause the cost to change significantly?
Costs vary greatly depending on the number of pages covered, the state of information preparation, the need for interviews, CMS constraints, measurement range, and the complexity of internal approval. Improving one service with complete documentation cannot be compared with the work of organizing a large number of product information for the same monthly fee.
If your budget is small, start with important service pages and a few related articles. Even if you reduce the scope, fact checking, post-publication operation confirmation, and change records will not be omitted. Before increasing the number of targets, create a system that allows you to implement and verify one improvement.
Companies with SEO contracts will first check for article improvements, internal links, and technical diagnosis included in the existing contract. It is important not to place duplicate orders for the same work with only the name changed to "AIO". For MEO, whose main purpose is to visit stores, and measures aimed at comparisons and inquiries on the web, avoid comparing only prices without aligning performance indicators.
5 steps to take before spending money
Before deciding on the scope of outsourcing, try out the following five items on one page to make it easier to distinguish between work that can be handled in-house and work that should be outsourced.
- Check the production URL. Check the intended body, HTTP response, canonical, and index controls in your browser and Search Console.
- Focus on one question from the reader. Determine your target audience, what they want to know, and what action you want them to take next, line by line.
- Add judgment material. The conclusion and application conditions are presented first, and are supplemented with a comparison table, cost items, verification conditions, and sources.
- Link to the next page to read. We will guide you to related articles and service pages using language that makes it easy to understand the content of the link destination.
- Leave changes and observation conditions. Record publication date, changes, search terms, device, country, and verification period for apples-to-apples comparisons.
| What to check | Estimated passing | If there is a problem |
|---|---|---|
| Publication URL | The intended text is displayed | Check the commit and build to be published |
| HTTP/canonical | Main page is 200 and canonical URL matches | Check for 404, forwarding, and canonical |
| Questions from readers | The conclusion and conditions are clear at the beginning | Narrow down your questions and add materials for judgment |
| Internal links | Follow from related pages | Add leads from list and text |
| Effect measurement | Compare before and after changes under the same conditions | Record dates, search terms, and target URLs |
If this check reveals any deficiencies, we can specifically tell you which aspects of diagnosis, manuscript, technical implementation, and measurement should be included in the estimate. This prevents rework, such as requesting only measurement without the URL being published, or not deciding who will be in charge of publishing the manuscript even after receiving it.
How do the 6-month and 12-month totals compare?
The comparison formula is Initial cost + monthly cost x number of months + additional implementation cost + tool cost + in-house man-hours. Tax classification, minimum contract period, early cancellation, and renewal conditions are also listed in the same table.
The following is a hypothetical comparison example assuming that all taxes are excluded. In-house man-hours are calculated on a monthly basis.
| Item | Plan A: mainly advice | Plan B: includes implementation |
|---|---|---|
| Initial cost | 100,000 yen | 200,000 yen |
| Monthly support | 100,000 yen | 150,000 yen |
| Additional implementation (once within the period) | 300,000 yen | 0 yen |
| Tool cost/month | 10,000 yen | 10,000 yen |
| In-house man-hours/month | 60,000 yen | 20,000 yen |
| Total amount for 6 months | 1.42 million yen | 1.28 million yen |
| 12 months total | 2.44 million yen | 2.36 million yen |
The total amount for 6 months for plan A is 10 + 10 x 6 + 30 + 1 x 6 + 6 x 6 = 1.42 million yen. Plan A looks cheap based on monthly support alone, but this assumption becomes reversed when internal work and additional implementation are included. However, it is necessary to separately confirm whether the deliverables and quality are equivalent. Even if implementation is included, if there is an upper limit on the number of times or scope, add those conditions.
How do you choose between in-house production, outsourcing, and combined production?
| Method | Suitable conditions | Burdens that are easy to overlook |
|---|---|---|
| In-house production | We have people in charge of editing, development, and measurement so we can continue updating | Learning, interviewing, verification, and changing personnel |
| Outsourcing | The issue is clear, but there is a lack of time and technology to implement it | Provision of information, approval, and additional corrections |
| Combined use | I want to prepare my company's specialized information in-house and leave the implementation to them | Role boundaries, handing over, and reviews |
The outsourcing company alone cannot decide whether or not to disclose the specifications, contract conditions, and results of its own products. Appoint an in-house person in charge of verification and check the explanations provided by the outsourced company against the facts.
How can I request a quote with the same conditions?
It will be easier to compare the following items if you give them the same information to each company.
- Target business/audience and search problem you want to solve.
- Target URL and preferred search terms/questions.
- Targeted services (Google search, specific AI answers, etc.).
- Scope of requests for manuscripts, interviews, images, implementation, and publication.
- Responsible for CMS/development environment and internal approvals.
- Required deliverables, delivery date, and number of revisions.
- Reporting frequency and indicators of views, traffic, and inquiries to check.
- Existing materials available and information that cannot be published.
- Budget limit, desired period, and conditions for determining continuation/termination.
- Manuscripts, settings, and records that you want to carry over at the end of the contract.
If the explanation is simply to "increase the citation rate," check what the denominator is, which questions to ask, when to measure, and how many times to measure. If you change the target question, the numbers will change, so please check the sample report and measurement conditions together.
How do you measure the cost-effectiveness of AIO measures?
Quotes/mentions, site visits, inquiries, business negotiations/orders are separate stages. Just because you're cited doesn't necessarily mean you'll get more visits or sales. Routes that cannot be measured will be treated as unmeasured, and all sales will not be attributed to AIO measures.
When calculating ROI, compare incremental gross profit that can be attributed to the initiative, rather than sales, to total costs. For example, assuming the incremental gross profit is 600,000 yen and the total cost is 400,000 yen, (60-40) ÷ 40 = 50%. This is an example calculation. If the attribution to the measure cannot be confirmed, ROI cannot be determined as a definite value.
For detailed record items, please refer to AIO Measures KPI Template | Entry Examples and How to Use.
What should I check before signing a contract?
- Is it just the manuscript, or does it include publication and operation confirmation?
- Monthly target number of books, number of questions, number of revisions, and excess unit price.
- The entity that owns and manages the tool contract, account, and data.
- Tax classification, minimum contract period, renewal/cancellation conditions.
- Is there a contract that "guarantees" rankings or citations?
- Records that can be published, their period, measurement conditions, and scope of responsibility.
Even if the price for a service is not fixed, you can compare it if the scope of work and the assumptions for the estimate are clear. On the other hand, even if you pay a low fixed price, you cannot make a decision without knowing what will be delivered.
FAQ
How much per month can I start taking AIO measures?
The published examples we have confirmed include plans that start at 49,800 yen (excluding tax) for single-shot diagnosis and 65,000 yen per month for continuous operation. This is not the lowest price in the entire market. Please compare the estimates by adjusting the tax, contract period, and scope of implementation, including the cost before entering into the continuation plan.
Can I take measures using only special tools?
Although tools are useful for observation and analysis, they are not a substitute for checking product information, conducting interviews, correcting text, and implementing sites. Include in your budget who will fix the problem after diagnosis.
How many months will it take to judge the effect?
There is no guarantee that your ranking or citations will improve over a period of time. Confirmation of publication/acquisition/registration and evaluation of display/visit/inquiry are separated. At the time of contract, we set an interim confirmation date to determine whether the implementation has not yet been implemented or whether the results will not change even if it has been implemented.
Preparation when consulting ZETTAi
Please organize the target site, the search terms you are having trouble with, the services you would like to improve, and the tasks that can be handled in-house. At ZETTAi's AI search countermeasures, you can consult about the scope of improvement and measurement methods for pages, grounds, and internal links. Prices and scope of delivery will be confirmed individually.
Related: How to choose an AIO countermeasure company | Things to check in proposals, performance indicators, and contracts / AIO countermeasure KPI template | Filling examples and how to use
Reference: Google search AI features and websites. The comparison table and request memo in this article are examples of editorial organization.
Google search AI features and websiteshttps://developers.google.com/search/docs/appearance/ai-features?hl=ja
Materials used for next confirmation