How to proceed with AI agent introduction | Determination criteria for introduction support, costs, and PoC
Those who are considering support from organizing the target business to prototyping and system coordination can check the implementation flow at ZETTAi AI agent construction support.
ZETTAi AI agent construction supporthttps://zettai-ai-agent-site-render.onrender.com/
When a company introduces an AI agent, it proceeds in the following order: Select one task → Prototype (PoC) to check effectiveness and failure cases → Operate within a limited range. Before requesting implementation support, decide which tasks will be delegated to what extent and where people will approve them. Once you know the necessary collaboration partners, information arrangement, and evaluation methods, you can specifically consult with the support company about the scope and cost you are looking for.
When choosing a support company, focus on how to stop and fix the process in case of failure, usage fees, and the scope of responsibility after handover, rather than the completed prototype screen. Please select one target business, provide a sample including normal cases and exceptions, and prepare the assumptions for the estimate.
We will check in order how to select a business, the details of the request to the implementation support company, the conditions for passing the PoC, the cost and the operation system. If you would like to consult about how it applies to your own business, you can check the scope of support at ZETTAi's AI agent development and implementation support.
*Introduction flow. At each stage, decide what to check before proceeding to the next step, and if the results of the prototype do not meet the passing conditions, review the scope. *
Does the work require an AI agent in the first place?
Simply saying "I want to introduce AI" does not allow you to choose the system you need. If your work involves referring to multiple materials or systems and determining the next process according to a step-by-step process, you may want to consider an AI agent. On the other hand, if you only need to draft a fixed phrase, an existing chat AI or template may be sufficient.
| What you want to do | How to try it first | Conditions for considering implementation support |
|---|---|---|
| Document summaries and drafts | Small trials using existing generation AI tools | Reference authority and source management for in-house materials is required |
| Collate multiple documents and make a proposal to the person in charge | Design a business flow with approval | Require multiple connection destinations such as customer information and schedule |
| Updating information and sending it externally | Start with a prototype that requires human confirmation | It is necessary to design update permissions, execution logs, and stop procedures |
By first determining whether existing tools are sufficient or whether separate development/coordination is required, it will be easier to avoid estimates that include unnecessary functions. Microsoft's Agent AI Implementation Guide (https://learn.microsoft.com/ja-jp/agents/adopt-overview), which serves as a resource for checking internal readiness, organizes aspects such as business value, governance, technology/data, and organization. This is not for the purpose of adopting a specific product, but can be used as a reference for identifying conditions that are lacking within your company.
Which job should you choose first?
Divide the current work into reception, information gathering, judgment, drafting, approval, and execution. For each, write down the materials used, the person in charge, the number of cases per month, and any problems you are having.
For example, when preparing for sales, the first tasks are checking the schedule,'' gathering customer information,'' and ``compiling negotiation notes,'' and the person in charge is responsible for contacting the customer. Limiting the scope makes it easier to identify causes and measure effects.
If there are multiple candidates, select the job that has a large number of candidates, can explain the input and expected output, and is easy for people to check the results. For operations that have a large impact on misprocessing, such as transferring money or automatically sending messages to customers, decide on a policy that requires approval from the first attempt rather than automatically executing them.
In the example of sales preparation, the input is visit schedule, customer materials, and past negotiation notes'', the output is preparation memo with sources'', and the person in charge's job is ``confirming facts and deciding on the next proposal''. If you don't include the part where the AI contacts the customer all at once, measure both the time it takes to make preparation notes and the time it takes to confirm, you can judge whether the burden has really been reduced. This is a hypothetical example for illustrative purposes only and is not an actual value.
In which four stages should we proceed with implementation support?
| Stages | Things to do | Conditions for next step |
|---|---|---|
| Organize | Decide on target operations, data, and responsible person | Input/output and confirmer are clear |
| Prototype | Try the process with a sample | You can check normal cases and exceptions |
| Trial operation | Practical use by a limited number of personnel | Acceptable quality and confirmation time |
| Establishment | Prepare procedure manuals, monitoring, and improvement personnel | Contact and stop operations in the event of a problem |
Separating the deliverables and costs for each stage will make it easier to decide if you need to change targets midway through.
Determine the passing conditions for the prototype first
Just because it "works" does not mean you can judge whether it can be used in practice. Before PoC (proof of concept), prepare multiple requests of the same type and record correctness, confirmation time, and behavior in case of exceptions. Compare the manual work before implementation and the total time after humans check the AI output under the same conditions.
| Confirmation items | Confirmation examples during sales preparation | Examples of failure |
|---|---|---|
| Correctness of information | Customer name and negotiation date match the original document | Information from another customer is mixed |
| Tracking the source | Open the original material from the summary | Unable to confirm the basis |
| Human approval | Reps see content before contacting customer | Send without confirmation |
| Exception handling | Waiting for confirmation when there is no material | Guessing and continuing processing |
| Effect | Compare the combined time for creation and confirmation | The burden of confirmation exceeds the original work |
Standards for acceptable errors and confirmation time vary depending on the job. The person in charge will decide before the trial, and if it doesn't match, the target range and procedures will be reviewed.
The evaluation looks not only at the final answer, but also what materials and tools were used to arrive at that result. Google Cloud's Official material for AI agent evaluation also shows the idea of evaluating the final answer and the path of tool usage separately. Regardless of the product you use, it will serve as a reference when creating a practical test sheet. For details on the decision to move from PoC to production, please see Causes and evaluation criteria for AI PoC failure.
Official material for AI agent evaluationhttps://docs.cloud.google.com/gemini-enterprise-agent-platform/models/evaluation-agents
Include “troublesome requests” in the test
If you only try general requests, you will miss exceptions in practice. Let's prepare a case where the materials cannot be found, there are multiple clients with the same name, the person in charge has left the company, or the requests are contradictory.
We evaluate not only whether the answer is correct, but also whether the process can wait for confirmation and not continue processing on its own. It's easier to track improvements when you can see the execution logs and the original documentation together.
When connecting to external services, separate viewing, updating, and sending permissions to avoid giving unnecessary permissions to the prototype. Decide how to stop erroneous processing and who will be responsible for checking records before the trial run.
When checking internal regulations and the division of roles with subcontractors, you can refer to IPA (Information-technology Promotion Agency)'s Guidebook for Safely Utilizing Generated AI and AI Agents (PDF). Be sure to record which items have been confirmed regarding your company's input information, users, contractors, and approvers. The approval design for external transmission and data updates is organized in detail in AI agent approval flow and authority management.
Guidebook for Safely Utilizing Generated AI and AI Agents (PDF)https://www.ipa.go.jp/jinzai/ics/core_human_resource/final_project/2026/rcu1hd0000018kkn-att/rcu1hd0000019kwj.pdf
What should I compare quotes from support companies?
Check the number of connections included in the construction cost, preparation of materials, explanations to employees, and number of revisions after implementation. Also decide who will respond to changes in external service specifications or changes in personnel.
Continuation of operations is affected by who manages accounts, source code, and configuration information. If you want to avoid a situation where you cannot change anything without asking the company in charge, please discuss the scope of transfer materials before signing the contract.
In the estimate, we will separately check not only the initial construction cost, but also the usage fee for the AI service, maintenance, monitoring, and change response for external collaboration. AI agent introduction cost | Initial/monthly breakdown and how to compare estimates organizes the items that affect costs.
| Items to compare | Questions to check with estimates |
|---|---|
| Scope of prototyping | To what extent does it include target operations, input materials, collaboration partners, and exception tests |
| Initial cost | Can you separate design, implementation, verification, and explanation to employees |
| Monthly cost | What are the upper limits for AI usage fees, monitoring, maintenance, and additional modifications |
| Handover | Who manages accounts, settings, logs, and termination procedures |
| Additional work | What is the unit price and approval method when the number of target operations and collaboration partners increases? |
Even if the amount is the same, the total burden will change if document preparation and operational transfer are not included. Compare quotes that match your conditions.
What should I tell them before requesting implementation support?
At your first consultation, you can consult multiple companies with the same conditions by summarizing the following six items on one sheet. Do not fill in the undecided fields with guesses, but write "Undecided."
| Item | Example of entry when targeting sales preparation |
|---|---|
| Target business | Gather customer materials and past business negotiation notes before visiting |
| Current problems | Information is in multiple locations and preparation takes time |
| Input and link destination | Calendar, customer management, internally shared materials. Connection availability is unconfirmed |
| Expected Output | Preparation notes with sources. Not sent to customers |
| Passing conditions | No mix-ups and comparison of required time including confirmation |
| Restrictions and persons in charge | Specify handling of customer information, viewing privileges, approvers, and suspension decision-makers |
It is important to separate and communicate work to be entrusted to a support company'' and work to be decided internally.'' Internal personnel are responsible for determining operational correctness and usable information. With ZETTAi implementation support service, you can check the scope of support from consultation to prototyping and operation.
Test table to determine pass/fail of prototype
If you're an agent helping with sales preparation, you might want to enter something like the following to see if it works: This is an example of evaluation design. Please decide the number of cases and allowable conditions according to your company's business.
| Situation to test | Expected behavior |
|---|---|
| Identify customers and related materials | Create preliminary notes with sources |
| There are multiple customers with the same name | Ask about the target and do not mix information from other companies |
| Necessary information is missing from the reference material | Mark as unknown and do not supplement the facts |
| User does not have permission to view | Do not display unauthorized materials |
| Connection destination does not respond | Notifies failure and does not treat it as completed |
Failures found during trial operations will be retained as confirmation data for repeated attempts even after corrections have been made. This is because we do not judge based on specific success stories.
What you will receive before moving to full-scale operation
In addition to usage instructions, you will receive a list of linkages and privileges, how to check usage fees, termination procedures, and contact information in the event of a failure. If an in-house person in charge actually attempts to stop and restart the system while receiving explanations, they can confirm any deficiencies that cannot be detected from documentation alone.
When consulting, please prepare a sample document that replaces the above request memo, business flow, and personal information, and draw the line between to what extent should it be automated'' and where should a human approve it?''
FAQ
Can I install it even if I don't have in-house engineers?
You can get support, but you need someone in-house to judge the correctness of your work. Let's separate the technical and operational responsibilities.
Is it better to implement it for all departments at once?
Although there are advantages to designing a common platform, it will be easier to verify if the initial demonstration is focused on a single task. Please also check the differences in materials and permissions for each department.
What should I give to the implementation support company in order to proceed with the consultation?
Please organize the procedures for the target work, the types of materials used, the number of cases per month, the amount of time it currently takes, and operations that require approval. Do not share actual data, including customer information, until you have confirmed the handling conditions, and use a sample with the content replaced first.
Related articles
- What is an AI agent? Differences with chat AI and how to incorporate it into work
- AI agent introduction cost | Initial/monthly breakdown and how to compare estimates
- AI agent approval flow and authority management | Determine the boundaries of automatic execution
- Why does AI PoC fail? Evaluation and judgment criteria for proceeding to production implementation
Official documents referenced in this article
The following are actual public documents. The tables and sales preparation examples in the article are not reprinted from these materials, but are examples created to help readers organize their company's conditions.
- Materials for considering the implementation system: Microsoft Learn "Introducing agent-based AI on a large scale" https://learn.microsoft.com/ja-jp/agents/adopt-overview
- Resources for evaluating PoC: Google Cloud "Evaluate Gen AI agents" https://docs.cloud.google.com/gemini-enterprise-agent-platform/models/evaluation-agents
- Materials for considering authority and security: IPA "Guidebook for safely utilizing generated AI and AI agents" (PDF) https://www.ipa.go.jp/jinzai/ics/core_human_resource/final_project/2026/rcu1hd0000018kkn-att/rcu1hd0000019kwj.pdf
Consult according to your company's situation
If you have decided on the target business, please see the details of implementation support at ZETTAi AI agent construction support.
ZETTAi AI agent construction supporthttps://zettai-ai-agent-site-render.onrender.com/
If you want to organize it yourself, please check What is an AI agent and Breakdown of implementation costs. If you have decided on the target work, you can check the scope of support at ZETTAi AI agent development and implementation support.
For individual consultations, please write the details of the above request memo in the "Inquiry details" section of the Corporate inquiry form. When first contacting them, instead of sending the client's name or confidential information, it will be easier to organize the next points to confirm if you tell them the outline of the business, the problem you are having, and the scope of support you would like.